Complex Projects Accomplished
Years as Project Manager
Hours with Product Development
MODULARIZATION CEILING HOIST SYSTEMS
As Project manager, I have run the largest development project in Guldmann's history, right from idea to implementation of the last product 10 years later. It was a complete new modularized product portfolio of Ceiling- and Mobile hoist and rail systems.
WALL MOUNTED RAIL SYSTEM
The target was to design a rail system that was fast to install and as low in cost as possible on a very tight time schedule.
WHAT THEY SAY?
Let's hear what his colleagues say about Henning Kristensen
GH1 F SELF INSTALLING LIFTING MODULE
Designing a flexible Ceiling Hoist that can be moved from one rail system to another. It installs and removes itself from the rail system automatically.
GH1 HOME CARE LIFTING MODULE
The target was to design a rail system that was fast to install and as low in cost as possible on a very tight time schedule.
STAGE MODEL FOR PRODUCT DEVELOPMENT
Describe and implement R&D Stage Gate model at Guldmann in accordance to FDA Desingn Control and Directive 93/42/EEC
Pleas do not hesitate to contact me.
COMFORT HOT WATER RECIRCULATION
Develop brand new Grundfos variant based on competitors technology and double up the production volume at the current factory facilities in Germany. After closing down and large development project of development new hot water recirculator pump, Grundfos bought a competitor, and I got the task to run this project from idea to launch as a project manager.
UPS CIRCULATER REDESIGN AND COST DOWN
Quality improvement and cost reduction on Grundfos Cash Cow.
Redesign terminal box, power terminals and speed selectors. Visual redesign of the complete pump taking full automatic assembly factory into account. This product was already at this time produced in very high volume, at that time 6.000.000 pumps/year.